About Tenaris and Its Relevance
Tenaris, a leading global manufacturer of seamless steel pipe solutions, is part of the Techint group. The company specializes in producing high-quality steel tubes used extensively in the oil and gas, and other industrial sectors. With a strong commitment to sustainability, Tenaris has embarked on an ambitious plan to reduce its carbon footprint.
Details of the New Wind Farm Project
Tenaris has initiated construction on its second wind farm in Argentina, named “Parque Eólico La Rinconada,” located in Olavarría, Buenos Aires Province. This investment of $214 million will include 21 wind turbines, providing a total installed capacity of 94.5 megawatts (MW).
First Wind Farm and Its Impact
Tenaris previously launched the “Parque Eólico Buena Ventura” in Gonzales Chaves, marking the company’s first wind farm globally. This initiative has already contributed to reducing Tenaris’ carbon emissions and supplying electricity to its Campana industrial hub, the company’s primary manufacturing center in Argentina.
Sustainability Goals and Achievements
Andrea Previtali, President of Tenaris Cono Sur, explained that the new wind farm is a significant step towards Tenaris’ corporate goal of reducing CO2 emissions by 30% by 2030, based on 2018 measurements. The La Rinconada wind farm is estimated to save approximately 100,000 tons of CO2 annually through its 21 wind turbines, each with a capacity of 4.5 MW.
Construction and Energy Contribution
The civil works and electrical infrastructure for the new wind farm began in 2024. Once operational, Tenaris’ Olavarría wind farm will contribute 400 gigawatt-hours (GWh) of electricity annually to the grid, thanks to an estimated utilization factor of 54.5%.
Key Questions and Answers
- What is Tenaris and its connection to this wind farm project? Tenaris, a prominent steel pipe manufacturer and part of the Techint group, is investing in this wind farm project as part of its commitment to sustainability and reducing carbon emissions.
- Why is this wind farm significant for Tenaris? This project, along with the previously established Parque Eólico Buena Ventura, supports Tenaris’ goal of reducing CO2 emissions by 30% by 2030, based on 2018 measurements. The new wind farm is expected to save around 100,000 tons of CO2 annually.
- What are the technical specifications of Parque Eólico La Rinconada? The wind farm will consist of 21 turbines, each with a capacity of 4.5 MW, resulting in a total installed capacity of 94.5 MW. The project is estimated to generate approximately 400 GWh of electricity annually.