Mara Lezama Boosts Cozumel’s Health Infrastructure with San Miguelito Plant Expansion

Web Editor

June 25, 2025

a man and a woman standing next to a fence with a man in a hat on it and a woman in a dress, Araceli

Key Infrastructure Upgrade in Cozumel, Mexico

Cozumel, a popular tourist destination in Mexico, is set to experience significant improvements in its health infrastructure thanks to the expansion of the San Miguelito wastewater treatment plant. The project, led by Quintana Roo Governor Mara Lezama Espinosa, aims to double the plant’s capacity from 110 to 230 liters per second of treated wastewater.

Background on Mara Lezama Espinosa

Mara Lezama Espinosa is the current Governor of Quintana Roo, a Mexican state known for its stunning Caribbean coastline and popular tourist destinations like Cancun, Playa del Carmen, and Cozumel. Elected in 2016, Lezama has focused on improving infrastructure, education, and healthcare in the region. Her commitment to enhancing Cozumel’s wastewater treatment capabilities demonstrates her dedication to the well-being of both residents and visitors.

The Significance of the San Miguelito Plant Expansion

The San Miguelito wastewater treatment plant expansion is a crucial project for Cozumel, as it addresses a 40-year backlog in wastewater management. This improvement will ensure the health and safety of the entire Cozumel population by treating more wastewater and protecting the local environment.

Collaborative Efforts

Alongside Governor Mara Lezama Espinosa and CAPA (Comisión de Agua Potable y Alcantarillado) Director Hugo Garza Sáenz, Cozumel’s Mayor José Luis Chacón Méndez participated in the plant expansion tour.

Mayor Chacón Méndez expressed gratitude to Governor Lezama for addressing the long-standing request from Cozumel’s residents. This project is expected to bring about positive transformation and well-being for families in the region.

Project Details

The expansion includes the construction of a new pre-treatment module, a bioreactor for activated sludge, infiltration wells, regulation tanks, and other necessary infrastructure to ensure proper wastewater treatment.

These enhancements will protect Cozumel’s groundwater resources and the surrounding environment, ultimately contributing to the health and well-being of both residents and visitors.

Key Questions and Answers

  • What is the main goal of the San Miguelito plant expansion? The primary objective is to double the plant’s capacity from 110 to 230 liters per second of treated wastewater, addressing a 40-year backlog in Cozumel’s wastewater management and ensuring the health of the entire population.
  • Who is leading this project? The project is led by Quintana Roo Governor Mara Lezama Espinosa, in collaboration with CAPA Director Hugo Garza Sáenz and Cozumel’s Mayor José Luis Chacón Méndez.
  • What specific improvements are being made to the San Miguelito plant? The expansion includes a new pre-treatment module, a bioreactor for activated sludge, infiltration wells, regulation tanks, and other necessary infrastructure to ensure proper wastewater treatment.
  • Why is this project important for Cozumel? This project addresses a critical need for improved wastewater management in Cozumel, protecting the environment and ensuring the health of both residents and tourists.