San Luis Potosí Government to Launch Water Project in Metropolitan Area

Web Editor

October 22, 2025

a road winding through a valley with a small town in the distance and a river running through it in

Project Overview and Key Details

Under the direction of San Luis Potosí State Governor Ricardo Gallardo Cardona, the State Water Commission (CEA) has completed a project to build a 7-kilometer acueduct. This acueduct will connect the Gonzalo N. Santos “El Peaje” dam to the San José dam, aiming to minimize water loss due to evaporation and seepage.

Project Objectives

  • Improve efficiency in surface water supply distribution
  • Reduce water losses from evaporation and seepage
  • Directly transport water resources, optimizing their use
  • Ensure a steady water flow to the San José dam, a primary water source for the capital city of San Luis Potosí

Project Implementation and Next Steps

The CEA technical team conducted a site visit to identify strategic construction points and ensure the project adheres to the highest quality standards. Construction is expected to commence in November.

Relevance of the Project

San Luis Potosí, a state in central Mexico, faces water supply challenges due to its semi-arid climate and growing population. The state capital, San Luis Potosí City, relies heavily on surface water sources like the El Peaje and San José dams for its water needs. This project aims to address water loss issues and ensure a reliable water supply for the metropolitan area.

Impact on the Community

This water project will significantly benefit the residents of San Luis Potosí City by providing a more stable and efficient water supply. By minimizing evaporation and seepage losses, the project will help maintain adequate water levels in the San José dam. This, in turn, will support sustainable urban development and improve the quality of life for the growing population.

Key Questions and Answers

  • What is the main objective of this project? The primary goal is to improve water supply efficiency, reduce losses from evaporation and seepage, and ensure a steady flow of water to the San José dam.
  • Who is leading this project? The State Water Commission (CEA) under the direction of San Luis Potosí State Governor Ricardo Gallardo Cardona.
  • When will construction begin? Construction is expected to start in November.
  • How will this project benefit the community? The project will provide a more reliable and efficient water supply for San Luis Potosí City, supporting sustainable urban development and improving residents’ quality of life.